Integration Scheduler

Pre-scheduling integrations

The Integration Scheduler allows an integration to be run on a pre-determined schedule.

Schedules can be set in terms of time intervals with millisecond granularity, or by specifying the day(s)-of-week or day(s)-of-month. Scheduled integrations will run until the schedule is disabled.

Integration Scheduler showing creation of an "every weekday" schedule

Scheduled integrations must be provided with a static payload at the time the schedule is created.

Last updated

Change request #178: